Almost finished the prep work

Taken a few months to get it all sorted but I have finanly managed to get to the end of our preperation work for the trooper.

Stuff thats been done to the truck so far;

  • New Clutch
  • Full service
  • New Brakes Pads
  • Brake Caliper Service
  • Brake Fluid replaced
  • new Shocks all round
  • Waterpump O-ring replaced
  • fuel line inspection
  • brake line inspection
  • New Foam in Drivers seat
  • Custom Made Roof Rack
  • New Imbiliser (1 key in old one)
  • New Key
  • sponsors decals
  • Obtained spare wheels
  • 4 part worn tyres (almost new)
  • Box of spare parts (coolant hoses, springs, alternator etc etc)
  • Spotlights (to be fitted)
  • Cow Horn (cant stop for anything and should be a laugh) Been scaring the locals at bus stops with it.
  • Added a set uf Used Wind Deflectors (no air con and the wind messes up my hair do! LOL)

All thats needed is a good valet and polish and were ready to hit London on 11th July for the launch.