Almost finished the prep work
Taken a few months to get it all sorted but I have finanly managed to get to the end of our preperation work for the trooper.
Stuff thats been done to the truck so far;
- New Clutch
- Full service
- New Brakes Pads
- Brake Caliper Service
- Brake Fluid replaced
- new Shocks all round
- Waterpump O-ring replaced
- fuel line inspection
- brake line inspection
- New Foam in Drivers seat
- Custom Made Roof Rack
- New Imbiliser (1 key in old one)
- New Key
- sponsors decals
- Obtained spare wheels
- 4 part worn tyres (almost new)
- Box of spare parts (coolant hoses, springs, alternator etc etc)
- Spotlights (to be fitted)
- Cow Horn (cant stop for anything and should be a laugh) Been scaring the locals at bus stops with it.
- Added a set uf Used Wind Deflectors (no air con and the wind messes up my hair do! LOL)
All thats needed is a good valet and polish and were ready to hit London on 11th July for the launch.