Almost finished the prep work

Taken a few months to get it all sorted but I have finanly managed to get to the end of our preperation work for the trooper.

Stuff thats been done to the truck so far;

  • New Clutch
  • Full service
  • New Brakes Pads
  • Brake Caliper Service
  • Brake Fluid replaced
  • new Shocks all round
  • Waterpump O-ring replaced
  • fuel line inspection
  • brake line inspection
  • New Foam in Drivers seat
  • Custom Made Roof Rack
  • New Imbiliser (1 key in old one)
  • New Key
  • sponsors decals
  • Obtained spare wheels
  • 4 part worn tyres (almost new)
  • Box of spare parts (coolant hoses, springs, alternator etc etc)
  • Spotlights (to be fitted)
  • Cow Horn (cant stop for anything and should be a laugh) Been scaring the locals at bus stops with it.
  • Added a set uf Used Wind Deflectors (no air con and the wind messes up my hair do! LOL)

All thats needed is a good valet and polish and were ready to hit London on 11th July for the launch.

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

You must be logged in to post a comment.